November 11, 2026

3 thoughts on “Australia’s data centre boom sparks protests over 15 metre power poles”

  1. Any of this ‘Infrastructure’, running near Any politicians/bureaucrats/Elite/upper echelon Executives abodes or their investment portfolios? – I’m guessing Not!

    I’ll also wager that no measurable consultations (If Any) between energy suppliers, concerned citizens and Enviro /Civil Planning/All metric Emmissions (Including EMRs and noise/light pollutions[includes at data centres])/Structural issues (Poles 15metres high > Sub terra anchoring volumes?)AND The apparent former Climate fear porn issues – All Before start up of installs.!

    UM, has the Climate Change agenda + the CO2 swindle, been temporarily put behind the Cosmic shower curtain, until Another ‘Roll out’ of Technology is completed? Amazingly, All 5G System roll outs and installs – During CONVID-19, had Zero Issues with personnel proximities, infrastructure supply and manpower acquisitions- at any level – Amazement again, especially the Pre planning and coordinations required!

    Last; Who’s ‘Actually’ paying for the Upgrades to the System? And, it’s been determined by many independent analysts, that the ‘Required Data Centre capacity’,is well beyond Civil requirements – Even in future! So what is the genuine reason for Necessity?

    Wellness, Unity

  2. I guess calling them “data centres” is safer for “the system” than “mass surveillance and control centres”, which could trigger an uprising…though probably not, given the aquiescence of most of the population during the Convid1984 atrocity.

Leave a Reply